By Peng Junjun
At about 8:30 on 13th March, an inspection train set out from Lvsi Port South Station slowly, and carried out inspection work at Yang-Lv Railway, marking the coming opening for operation along the whole line.
Yang-Lv Railway connects with Beiyu Station of Hai'an–Yangkou Port railway in the north, and Lvsi Station of Nanjing-Qidong Railway in the south. It passes Qidong, Haimen, Tongzhou Bay Demonstration Zone, and Rugao. It is a National Railway Class II Single-track Railway. The total length of the main line is about 78 km. The design speed is 120 km per hour.
