By Wu Xiaoyun
On 21st August, Liberian general cargo ship ‘XIONGAN’ loaded with 6 wind turbines made in China, set out from Tongzhou Bay New Estuary Lvsi Qibu Harbour ‘2+2’ Port to Saudi Arabia.
The 6 wind turbines were made by Envision Energy for the NEOM green hydrogen project of Saudi Arabia. The project is expected to install 257 Envision Energy 6.5 MW wind turbines. The total installed capacity of wind power will reach 1.67 GW. It is expected to go into full operation before 2026.