On 2 December, a foreign ship was being loaded with wind turbine blades at 100 thousand ton general port berth of Tongzhou bay new estuary Qidong Lvsi start up port. In the first 11 months of the year, 87 foreign trade ships have operated in Lvsi start up port ‘2+2’ port. The cargo throughput is 1.75 million cubic meters.
Photo by Xu Congjun